What peak particle velocity is safe for houses near a blast?
| Structure | Below 40 Hz, in/sec | Above 40 Hz, in/sec |
|---|---|---|
| Modern homes, Drywall interiors | 0.75 | 2.0 |
| Older homes, plaster on wood lath construction | .50 | 2.0 |
22 mining engineering references, over 12,000 pages, searched from inside Claude, ChatGPT or Cursor. Every answer quotes the passage and names the book and page.
Connect URL
https://mcp.bigdogmining.com/mcp
Paste it into your AI app as a custom connector. How, step by step.
Also on this connection: MSHA safety data.

How answers come back
It quotes short passages and cites them. It never hands over whole chapters or books.
What it covers
Blast design, powder factor, burden and spacing, stemming, controlled blasting, and the ground vibration and airblast limits for nearby homes.
From SME Mining Engineering Handbook, SME Mining Reference Handbook, Rock Mechanics for Underground Mining, USBM RI 8507 and RI 8485
Rock mass classification (RMR, GSI, RQD), pillar design, rock and cable bolting, mesh and shotcrete, dynamic support, rockbursts, slope stability and subsidence.
From Rock Mechanics for Underground Mining, Ground Support in Mining and Underground Construction, SME Mining Engineering Handbook, SME Mining Reference Handbook
Ventilation planning, auxiliary ventilation, fans, diesel dilution and diesel particulate, mine gases, dust control, fires and explosions, cooling.
From Underground Ventilation (19th North American Mine Ventilation Symposium), SME Mining Engineering Handbook, SME Mining Reference Handbook
Crushing and grinding, classification, flotation, physical separation, solid and liquid separation, hydrometallurgy, pyrometallurgy, and plants for selected metals.
From SME Mineral Processing and Extractive Metallurgy Handbook, SME Mining Engineering Handbook, SME Mining Reference Handbook
Production estimates, job efficiency, rolling resistance, owning and operating cost, haul roads, matching loaders to trucks, hoisting and underground ore movement.
From Caterpillar Performance Handbook, SME Mining Engineering Handbook, SME Mining Reference Handbook, Mine Planning and Equipment Selection
Open-pit planning, underground method selection, caving, longwall, room and pillar, feasibility studies, cost estimating and running the project.
From SME Mining Engineering Handbook, Mine Planning and Equipment Selection, Mine Design, Planning and Sustainable Exploitation in the Digital Age, Project Management for Mining
Deposit models, sampling and Gy's formula, and how resources and reserves are classed and converted.
From SME Mining Engineering Handbook, SME Mining Reference Handbook, Mine Design, Planning and Sustainable Exploitation in the Digital Age
Dewatering and pumping, tailings dams, water management, waste disposal, mine closure and acid mine drainage, reclamation.
From SME Mining Engineering Handbook, SME Mining Reference Handbook, Mine Design, Planning and Sustainable Exploitation in the Digital Age, Mine Planning and Equipment Selection
How MSHA reads its standards and runs general and health inspections, the small mine guide, and miners' rights.
From MSHA Program Policy Manual, Volumes I to V, General and Health Inspection Procedures Handbooks, Small Mine E-Guide, Miners' Rights and Responsibilities
What you can ask
We ran every one of these against the live server on November 6, 2026. Under each is a short excerpt of what came back, quoted as the book prints it, with the citation the server returned.
Pattern, powder and vibration, from the books that set the rules.
What peak particle velocity is safe for houses near a blast?
| Structure | Below 40 Hz, in/sec | Above 40 Hz, in/sec |
|---|---|---|
| Modern homes, Drywall interiors | 0.75 | 2.0 |
| Older homes, plaster on wood lath construction | .50 | 2.0 |
What powder factor should I start from for surface blasting?
| Rock breakage | Powder factor, lb/yd³ |
|---|---|
| Low | 0.25-0.40 |
| Medium | 0.40-0.75 |
| High | 0.75-1.25 |
| Very high | 1.25-2.50 |
Burden and spacing as a multiple of hole diameter, for a bench blast?
| ANFO | Blends and emulsions | |
|---|---|---|
| Burden | x 24 (2 ft/in.) | x 30 (2.5 ft/in.) |
| Spacing | x 36 (3 ft/in.) | x 42 (3 ft/in.) |
From the U.S. columns. The metric multipliers come back in the same table.
Rock mass, support and fill.
How does RMR class a rock mass?
| RMR | Class | Rock |
|---|---|---|
| 100 – 81 | I | Very good rock |
| 60 – 41 | III | Fair rock |
| <21 | V | Very poor rock |
Classes II and IV come back in the same table.
What energy absorption should fibre shotcrete have where we expect strain bursts?
"In areas of anticipated significant deformation, seismicity, or potential strain burst, a minimum energy absorption capacity of 400 J should be used based on RDP40mm. In extreme cases, this should be increased to 540 J."
How much cement goes in paste fill for primary and secondary stopes?
"For the secondary stope fill, a minimum of 1% cement is required to minimize the potential for liquefaction."
The same passage gives 5% cement for primary stope fill.
Airflow rules from more than one country.
What diesel airflow do mines design to per kW, country by country?
| Where | Diesel airflow |
|---|---|
| Western Australia | 0.05 m³/s per kW |
| Ontario, Canada | 0.06 m³/s per kW |
| Chile | 0.063 m³/s per kW |
| Indonesia | 0.067 m³/s per kW |
| United States | 0.032 to 0.094 m³/s per kW |
From Table 15.3-3, Diesel dilution requirements for selected locations.
Grinding, flotation and the plant.
What percent of critical speed should a ball mill run at?
| Liner inside diameter, ft | Ball mills, % of critical |
|---|---|
| 6-9 | 78-75 |
| 9-12 | 75-72 |
| 12-15 | 72-69 |
| 15-18 | 69-66 |
Resources, reserves and what holds the tailings back.
Can an Indicated Resource become a Proven Reserve?
"An Indicated Mineral Resource has a lower level of confidence than that applying to a Measured Mineral Resource and may only be converted to a Probable Ore Reserve."
What are the main ways to build a tailings dam?
"The common methods include: • Conventional method • Downstream method • Upstream method • Centreline method"
Production factors and how far to trust an estimate.
What job efficiency should I use for day and night shifts?
| Shift | Working hour | Efficiency factor |
|---|---|---|
| Day | 50 min/hr | 0.83 |
| Night | 45 min/hr | 0.75 |
How accurate is a scoping, prefeasibility or feasibility cost estimate?
| Study | Accuracy | Contingency |
|---|---|---|
| Conceptual or Scoping Study | ±35% | 25% |
| Prefeasibility Study | ±25% | 15% |
| Feasibility Study | ±15% | 10% |
From Table 5.1-3, specifications for operating cost estimates in feasibility studies.
Quoted from published references for research. They are not engineering designs: decisions on a live operation belong to the competent person on site.
The 22 references
Same connection
MSHA accidents since 2000 and citations since 1994, with rates, narratives and charts, plus British Columbia and Quebec.
Connect it
You need the connect URL and a work email. Sign-up is free: we email you a 6-digit code, you press Approve, and you are in. Signing up also adds you to The Pulse, our mining newsletter. One click unsubscribes, and the tools stay free either way.
One connection gives your AI both: MSHA safety data and the mining engineering handbooks. Connect once from either page.
On claude.ai or the Claude desktop app. These are screenshots from a real sign-up.
In Claude, open Customize in the sidebar (or Settings, then Customize). On the Connectors tab, press Add and pick Add custom connector.

Name: Big Dog Mining. URL: https://mcp.bigdogmining.com/mcp. Press Continue.

Claude detects the sign-in on its own: Sign in now is already picked. Nothing else to set.

Big Dog Mining now shows in your connectors. Press Connect to sign in.

Tick the box and press Email me a code. The code comes from Big Dog Mining within a minute. Check spam if it does not.

It works for 15 minutes. Lost it? Press Send a new code.

The page lists what Claude can do with it. It is read only: it sees nothing of yours and changes nothing. You land back in Claude.

All ten tools are read only. Set Read-only tools to Always allow and Claude will not stop to ask before each one.

Start a new chat and ask in plain words. Saying "using the Big Dog Mining connector" helps Claude pick it the first time.

Custom connectors depend on your ChatGPT plan and settings. Menu names change between releases; look for these.
https://mcp.bigdogmining.com/mcp. Authentication: OAuth.For engineers who live in an editor.
~/.cursor/mcp.json by hand.{
"mcpServers": {
"big-dog-mining": {
"url": "https://mcp.bigdogmining.com/mcp"
}
}
}
Any other app that supports remote MCP servers with sign-in works the same way: paste the URL, then sign in with your email.
Want the same thing on your own documents?
Procedures, contracts, ground support plans and past reports, searchable by asking, in your own cloud. Every answer shows the page it came from.